top of page
London City

HENDON WATERSIDE - Situated next to the scenic Welsh Harp Reservoir - 170 hectares of green space. Six buildings at the centre of Phase 4; Blocks H1/H2, Block J, Blocks K1/K2 and Block M.  Hanover have been contracted to carry out MEP design and installation for Block K1/K2.

 

Phases K1 to K2 comprise 186 (1 to 3 bedroom) apartments for private ownership. 

The typical plan contains a mix of 7 units, and is optimised in terms of efficiency, space, light and views. The main entrances for K1 and K2 are located on West Street, with strongly framed porches.

 

We are thrilled to have joined Barratt London on such an important scheme in North West London, forming part of the regeneration of West Hendon. 

Hanover's’ Scope of Works:  Central Boiler Room Works & Energy Centre, Above Ground Drainage & Rainwater Drainage, Gas Central Heating, Heat Interface Units, Hot Water Cylinders, Electrical Distribution, Boosted Water Services, LTHW Distribution, Dwelling Lighting and Power, Communal Lighting and Power, Landscape Lighting, MVHR Systems, Fire Alarm Systems, Mechanical Ventilation & Smoke Clearance, Wet and Dry Riser, Communal and Domestic Sprinkler Systems, Integrated Reception System, Door Entry & Access Control Systems, CCTV System, Electric Car Charging Points, Gate Automation, Lightning Protection System.

 

bottom of page