top of page

Acton Gardens Phase 9.2

Hanover have been successful on the Acton 9.2 project, a JV project between Countryside and L&Q. The project is the sixth consecutive phase and will have installed the electrical installation to over 1000 dwellings to the development, since 2016.


This particular phase consisted of a 15 storey structure, totalling 203 units, and Hanover were involved in the electrical infrastructure, L&P, Emergency Lighting, UPS, Access Control, Fire Alarm, AOV, IRS, CCTV, Data and External Lighting







Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page