West Hendon

In partnership with Barratt London, Hanover were engaged to carry out MEP design services and installation on the West Hendon Regeneration. The overall scheme will include 2,000 new homes with 10% being wheelchair accessible, new public open spaces & parks and improved local amenities.

 

​In 2015 HBS completed phases E1 to E4, comprising 287 apartments. Our project team consisted of 3 dedicated supervisors with a team of over 40 engineers. 

 

The scope of this project included a Energy Centre, serving the entire site consisting of central boilers, boosted cold water and low temperature hot water services and waste water management. HBS also delivered MEP services to the dwellings including low energy lighting, small power and ancillary services, underfloor and radiant heating systems along with the sanitaryware and MVHR ventilation systems.

E4 was delivered within a compressed construction programme of 16 weeks owed to working closely with Barratt London, and to the knowledge and expertise of our on-site project management team.

 

The success of this phase led to further engagement by Barratt London and HBS in 2019. MEP services were installed to two subsequent phases of works: F1-F4 (Phase 3) another 207 units and a further 47 units to H1 (Phase 4).

 

By 2027, the regeneration will have created 1,000 new construction jobs, new primary school and children’s play areas, new community centre, an enhanced town centre with more shops & restaurants and improved transport links & more parking.

We were thrilled to have joined Barratt London on such an important scheme in North West London, forming part of the regeneration in this part of London Borough of Barnet.


Hendon Waterside will be a fresh start for the area and neighbouring Brent Cross, which has been granted a £4 billion masterplan to the proposed new town centre.

 

The masterplan will create 2,000 homes, 2700 jobs, three re-built schools, new parks and community facilities, and major road and public transport improvements.

Our works in more detail

  • Central Boiler Room Works & Energy Centre

  • Above Ground Drainage & Rainwater Drainage

  • Heat Interface Units

  • Hot Water Cylinders

  • Electrical Distribution

  • Boosted Water Services

  • LTHW Distribution

  • Dwelling Lighting and Power

  • Communal Lighting and Power

  • Landscape Lighting   

  • MVHR Systems

  • Fire Alarm Systems 

  • Mechanical Ventilation & Smoke Clearance 

  • Underfloor Heating Systems 

  • Comfort Cooling

  • Control Wiring

  • Dry Riser

  • Sprinkler Systems

  • Integrated Reception System

  • Photovoltaic System

  • Door Entry & Access Control Systems

  • Electric Car Charging Points

  • Gate Automation

  • CCTV System 

  • Lightning Protection System

© 2019 by Hanover Electrical Contrators Ltd

Reg No. 3065752

Hanover_Logo_2017.png
  • Twitter - Grey Circle
  • LinkedIn - Grey Circle
87812_945908_IMG_05_0000_max_656x437